Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Coating - Matt Finish, 20kg Barrel for Applications
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Epoxy Zinc Primer Anti-Corrosive Coating for Chemical Plant Safety and Durability
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
Prepare the steel surface with shot or sand blasting to achieve Sa2.5 level, or use manual rust removal to reach St3 level.
3. Construction conditions:
Ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity below 85%, and wind force at or below level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reactions, necessitating construction halts. Refrain from outdoor construction on rainy, foggy, windy, or sandy days and avoid morning and evening condensation.
4. Notes:
1. Prior to application, mechanically stir component A to a uniform consistency, then blend it thoroughly with component B.
2. Regular stirring during application is essential to prevent sedimentation, which can disrupt the powder-liquid ratio, compromising paint film quality.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats.
4. The combined two-component paint should be used within 5 hours to maintain coating integrity.
5. After depleting the curing agent, seal it tightly and use promptly to avert loss due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
