Model: FD-H001

FD-H001 Epoxy Zinc Coating - Matt Finish, 20kg Barrel for Applications

FD-H001 two-component epoxy anti-corrosion coating for steel substrates.

Reference price (FOB)

US $2-10 / kg

QuantityReference price
100-999 kgUSD 10.00 / kg
1,000-999,999 kgUSD 6.00 / kg
1,000,000+ kgUSD 2.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
Signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Epoxy Zinc Primer Anti-Corrosive Coating for Chemical Plant Safety and Durability

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface treatment:
Prepare the steel surface with shot or sand blasting to achieve Sa2.5 level, or use manual rust removal to reach St3 level.

3. Construction conditions:
Ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity below 85%, and wind force at or below level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reactions, necessitating construction halts. Refrain from outdoor construction on rainy, foggy, windy, or sandy days and avoid morning and evening condensation.

4. Notes:
1. Prior to application, mechanically stir component A to a uniform consistency, then blend it thoroughly with component B.
2. Regular stirring during application is essential to prevent sedimentation, which can disrupt the powder-liquid ratio, compromising paint film quality.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats.
4. The combined two-component paint should be used within 5 hours to maintain coating integrity.
5. After depleting the curing agent, seal it tightly and use promptly to avert loss due to reactions with atmospheric moisture.

FD-H001 Epoxy Zinc Coating - Matt Finish, 20kg Barrel for Applications
FD-H001 Epoxy Zinc Coating - Matt Finish, 20kg Barrel for Applications

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote