Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable Matt Zinc Rich Epoxy Paint
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2.5-6.5 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 6.50 / kg |
| 1,000-999,999 kg | USD 4.50 / kg |
| 1,000,000+ kg | USD 2.50 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Singal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be prepared by shot blasting or sand blasting to Sa2.5 level, or manually cleaned to St3 level for optimal application.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity <85%, and wind force ≤ level 3. If the substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent halts, and application should cease. Avoid construction during rainy, foggy, windy, or sandy conditions and during times of morning and evening dew for best results.
4.Notes:
1. Prior to application, use mechanical stirring to thoroughly mix component A, then combine it evenly with component B.
2. Stir regularly during application to prevent sedimentation, which could disrupt the balance between powder and liquid, potentially compromising the paint film's quality.
3. It is advisable that the dry film thickness measures ≥70μm, achieved with 1 to 2 coats.
4. After components are mixed, the paint should be used within 5 hours to maintain quality, as extended time may affect the coating's effectiveness.
5. Once the curing agent is depleted, ensure the container is sealed tightly and used promptly to prevent any reaction with atmospheric moisture, which could lead to losses.
Discuss this product for your project
Include your application, required quantity and destination.