Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Zinc Rich Epoxy Paint
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2.5-6.5 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 6.50 / kg |
| 1,000-999,999 kg | USD 4.50 / kg |
| 1,000,000+ kg | USD 2.50 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- Singal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Zinc Rich Epoxy Primer - Sewage Plant Metal Protection Anti-Corrosive Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel must be shot or sand blasted to Sa2.5 level, or manually treated to St3 for optimal preparation.
3. Construction Conditions:
Ensure substrate temperature is over 3°C above dew point, RH <85%, wind ≤ level 3. Halt construction if temperature is below 5°C as epoxy and curing agents cease reaction. Avoid adverse weather and condensation.
4. Notes:
1. Prior to use, thoroughly stir component A mechanically, then mix evenly with component B.
2. Stir regularly during application to prevent sedimentation, which may disturb powder-to-liquid balance and degrade film quality.
3. Recommended dry film thickness should be ≥70μm, applied in 1 to 2 coats for best results.
4. Use mixed two-component paint within 5 hours to maintain coating quality.
5. Seal used curing agent tightly and use promptly to avoid moisture-induced loss.
Discuss this product for your project
Include your application, required quantity and destination.
