Model: FD-H001

FD-H001 Matt Zinc Rich Epoxy Paint for Various Applications

FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.

Reference price (FOB)

US $2.5-6.5 / kg

QuantityReference price
100-999 kgUSD 6.50 / kg
1,000-999,999 kgUSD 4.50 / kg
1,000,000+ kgUSD 2.50 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Color
Grey
Appearance
Liquid
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Trademark
Singal
Transport Package
Barrel Package in Pallet
Specification
35*30
Origin
Dongying China
HS Code
3208100000
Customization
Available
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
Ensuring optimal surface preparation, the steel surface should be meticulously shot or sand blasted to an Sa2.5 level, or manually treated to achieve an St3 level.

3.Construction conditions:
To secure ideal results, the substrate temperature must exceed the dew point by at least 3°C, with relative humidity maintained below 85%, and wind force at or below level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reacting, halting construction. Outdoor application should avoid adverse weather conditions such as rain, fog, wind, and sand, as well as morning and evening condensation.

4.Notes:
1. Prior to use, thoroughly employ mechanical stirring to blend component A, followed by mixing with component B for uniform consistency.
2. Regular stirring during application is essential to prevent sedimentation which could disrupt the balance between powder and liquid, thereby impacting the quality of the paint film.
3. For optimal protection, a dry film thickness of at least 70μm is recommended, with 1 to 2 coats applied.
4. Once mixed, utilize the two-component paint within 5 hours to ensure the highest coating quality. Extending beyond this period might compromise the results.
5. After consumption of the curing agent, ensure it is tightly sealed and used promptly to prevent any unwanted reactions with moisture in the air, thereby avoiding potential losses.

FD-H001 Matt Zinc Rich Epoxy Paint for Various Applications
FD-H001 Matt Zinc Rich Epoxy Paint for Various Applications

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote