Model: FD-H001

FD-H001 Sewage Plant Metal Protection Epoxy Primer

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $2.5-6.5 / kg

QuantityReference price
100-999 kgUSD 6.50 / kg
1,000-999,999 kgUSD 4.50 / kg
1,000,000+ kgUSD 2.50 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
Singal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,and is cured by polyamide.It isconveniently packed as dual componentsAand B.Key Characteristics:Offers highshielding properties and superioranti-rustcapabilities. It boasts strongadhesion and provides excellent oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface Preparation:
The steel surface should be shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level for optimal results.

3. Recommended Construction Conditions:
Ensure that the substrate temperature exceeds the dew point by at least 3°C, with a relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, epoxy resin and curing agents cease to react, necessitating a halt in construction. Avoid conducting outdoor construction during rainy, foggy, windy, or sandy days, and during periods of condensation in the morning or evening.

4. Important Notes:
1. Prior to application, mix component A thoroughly using mechanical stirring, then blend it evenly with component B for best results.
2. Stir regularly during the coating process to prevent sedimentation, ensuring a balanced powder to liquid ratio for superior paint film quality.
3. Achieving a dry film thickness of at least 70μm is recommended, with 1 to 2 coats completed as needed.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain optimal coating quality.
5. After using up the curing agent, ensure it is sealed tightly and used promptly to prevent reactive losses with atmospheric water vapor.

FD-H001 Sewage Plant Metal Protection Epoxy Primer
FD-H001 Sewage Plant Metal Protection Epoxy Primer

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote