Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Sewage Plant Metal Protection Epoxy Primer
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2.5-6.5 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 6.50 / kg |
| 1,000-999,999 kg | USD 4.50 / kg |
| 1,000,000+ kg | USD 2.50 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Singal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Preparation:
The steel surface should be shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level for optimal results.
3. Recommended Construction Conditions:
Ensure that the substrate temperature exceeds the dew point by at least 3°C, with a relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, epoxy resin and curing agents cease to react, necessitating a halt in construction. Avoid conducting outdoor construction during rainy, foggy, windy, or sandy days, and during periods of condensation in the morning or evening.
4. Important Notes:
1. Prior to application, mix component A thoroughly using mechanical stirring, then blend it evenly with component B for best results.
2. Stir regularly during the coating process to prevent sedimentation, ensuring a balanced powder to liquid ratio for superior paint film quality.
3. Achieving a dry film thickness of at least 70μm is recommended, with 1 to 2 coats completed as needed.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain optimal coating quality.
5. After using up the curing agent, ensure it is sealed tightly and used promptly to prevent reactive losses with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
