Model: FD-H001

FD-H001 Zinc Epoxy Primer for Sewage Plant Protection

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $2.5-6.5 / kg

QuantityReference price
100-999 kgUSD 6.50 / kg
1,000-999,999 kgUSD 4.50 / kg
1,000,000+ kgUSD 2.50 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
Singal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, enriched with phosphorironpowder,rust-proofpigment, and other high-performance ingredients, all expertlycured by polyamide.It isconveniently packed by dual componentsAand B, ensuring optimal performance.Characteristics:Boasting a highshielding property, this primer offers superioranti-rustprotection with strongadhesion. Its resilience extends to excellent oilandwaterresistance, promising long-lasting durability.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring a pristine foundation.

3.Construction conditions:
For optimal conditions, ensure the substrate temperature is 3°C higher than the dew point, with relative humidity <85%, and wind force ≤ level 3. When temperatures drop below 5°C, the epoxy resin and curing agent cease to react, halting construction. Steer clear of rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation for outdoor projects.

4.Notes:
1. Prior to application, employ mechanical stirring to achieve a uniform mix of component A before blending evenly with component B.
2. Regular stirring during the coating process is essential to prevent sedimentation and maintain an ideal powder to liquid ratio, safeguarding the quality of the paint film.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for best results.
4. After mixing, utilize the two-component paint within 5 hours to preserve coating quality.
5. Post-use, tightly cover the curing agent and use promptly to avert losses from reactions with moisture in the air.

FD-H001 Zinc Epoxy Primer for Sewage Plant Protection
FD-H001 Zinc Epoxy Primer for Sewage Plant Protection

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote