Model: FD-H001

FD-H001 Epoxy Primer for Brush and High Pressure Airless Spray

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

FD-H001 Epoxy Primer for Brush and High Pressure Airless Spray
1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared through shot or sand blasting to the Sa2.5 level, or manually rust-treated to the St3 level, ensuring optimal adhesion and longevity.

3.Construction conditions:
For perfect results, ensure substrate temperature exceeds the dew point by 3°C, humidity is under 85%, and wind force is no more than level 3. Construction halts if the temperature dips below 5°C, as the epoxy and curing agent cease reacting. Avoid outdoor tasks during adverse weather like rain, fog, strong winds, or sandstorms, and stay clear of morning and evening condensation.

4.Notes:
1. Before application, mechanically stir component A thoroughly, then blend it seamlessly with component B to ensure a uniform mixture.
2. Regular stirring during application is crucial to prevent sedimentation, which can disrupt the powder-to-liquid balance and compromise the paint film quality.
3. Aim for a dry film thickness of ≥70μm, executing between 1 to 2 coats for the best coverage and protection.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain quality; extended exposure can diminish effectiveness.
5. After using the curing agent, seal it tightly to prevent reactions with moisture in the air, and use it up promptly to avoid unnecessary loss.

FD-H001 Epoxy Primer for Brush and High Pressure Airless Spray
FD-H001 Epoxy Primer for Brush and High Pressure Airless Spray

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote