Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer: Anti-Rust Coating for Steel
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
To ensure optimal results, the substrate temperature must be at least 3°C above the dew point with a relative humidity below 85% and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the reactive process of the epoxy resin and curing agent halts, necessitating a pause in construction activities. Outdoor applications should be avoided during rainy, foggy, windy, or sandy conditions, as well as during times of condensation in the early morning or late evening.
4.Notes:
1. Prior to application, component A should be thoroughly mixed using mechanical stirring, followed by an even mixing with component B to ensure consistency.
2. Maintain regular stirring throughout the application process to prevent sedimentation, which can disturb the powder-to-liquid balance, potentially compromising the paint film's quality.
3. A dry film thickness of at least 70μm is recommended, with the application of 1 to 2 coats ensuring optimal coverage and protection.
4. The mixed two-component paint should ideally be used within 5 hours to preserve its quality. Exceeding this timeframe may negatively affect the coating's performance.
5. Once the curing agent is opened, it should be securely covered and utilized promptly to avoid losses caused by reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.