Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Primer Coating, 20kg for High Pressure Airless and Brush
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring a pristine foundation.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force no more than level 3. When temperature is below 5°C, epoxy resin reactions halt, ceasing construction. Avoid construction during rainy, foggy, windy or sandy conditions, and condensation in mornings and evenings.
4.Notes:
1. Prior to application, mechanically stir component A thoroughly, then mix it evenly with component B for optimal consistency.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which can disrupt the powder to liquid ratio and compromise paint film quality.
3. For best results, aim for a dry film thickness of at least 70μm, applying 1 to 2 coats.
4. Once mixed, use the two-component paint within 5 hours to maintain coating integrity, as exceeding this time may affect quality.
5. After using the curing agent, seal it tightly and use promptly to prevent losses from reactions with airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
