Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Rust Zinc Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to a pristine Sa2.5 level, or carefully manually rust-removed to a refined St3 level.
3.Construction conditions:
Ensure the substrate temperature is consistently 3°C higher than the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3. Construction should be halted when substrate temperatures fall below 5°C, as the epoxy resin and curing agent will cease to react. Avoid construction during adverse weather conditions such as rain, fog, strong winds, and sandy days, as well as during condensation risks in the morning and evening for outdoor projects.
4.Notes:
1. Prior to application, thoroughly utilize mechanical stirring to mix component A until uniform, followed by an even mixture with component B.
2. Consistently stir during the coating process to avert sedimentation, which could disrupt the powder to liquid balance and compromise the integrity of the paint film.
3. It is advised that the dry film thickness be maintained at ≥70μm, completing 1 to 2 robust coats.
4. Post-mixing, the two-component paint should ideally be consumed within a 5-hour timeframe. Extending beyond this period could potentially impact the coating quality.
5. Once the curing agent is depleted, ensure it is sealed tightly and used promptly to avoid losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
