Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Rust System for Steel: Zinc Epoxy Primer
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to Sa2.5 level, or diligently rust-removed to St3 level, ensuring a pristine canvas for application.
3. Construction conditions:
To guarantee optimal results, ensure the substrate temperature is at least 3°C above the dew point, maintain relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, halt construction as the epoxy resin and curing agent cease reacting. Avoid construction on days with rain, fog, high winds, or sand, as well as during morning and evening condensation for outdoor projects.
4. Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, ensuring a uniform blend before combining evenly with component B.
2. Continuously stir during application to prevent sedimentation, which can disrupt the powder to liquid balance and compromise the quality of the paint film.
3. Aim for a dry film thickness of ≥70μm, ideally completing 1 to 2 coats for best results.
4. Once mixed, utilize the two-component paint within 5 hours. Exceeding this timeframe may detrimentally affect the coating quality.
5. After using the curing agent, seal it tightly and use promptly to prevent losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
