Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Coating: Zinc-Rich Epoxy Primer
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Title: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Preparation:
The steel surface is expertly shot blasted or sand blasted to Sa2.5 level, or manually treated to remove rust up to St3 level.
3. Application Conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid installation during inclement weather conditions such as rain, fog, wind, and sand, as well as condensation during morning and evening for outdoor projects.
4. Important Notes:
1. Before application, use a mechanical stirrer to thoroughly mix component A, then blend evenly with component B.
2. Continuously stir during the coating process to prevent sedimentation, which may disrupt the powder-to-liquid balance and compromise the paint film quality.
3. For optimal results, ensure a dry film thickness of at least 70μm, applying 1 to 2 coats as necessary.
4. Once mixed, the two-component paint should ideally be utilized within 5 hours to maintain coating integrity.
5. After using up the curing agent, seal it tightly and use promptly to prevent losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
