Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Efficient Matt Epoxy Paint Primer for High Pressure Airless Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is expertly prepared by shot blasting or sandblasting to Sa2.5 level, or manually rust-removed to St3 level for optimal results.
3. Construction conditions:
The substrate temperature must be at least 3°C above the dew point, with relative humidity under 85%, and wind force no greater than level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent reaction halts, necessitating a pause in construction. Avoid outdoor construction during rainy, foggy, windy, or sandy conditions, as well as during morning and evening condensation.
4. Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, then combine evenly with component B.
2. Regular stirring during application is essential to prevent sedimentation, which could lead to an imbalanced powder-to-liquid ratio and compromise the paint film's quality.
3. It is recommended to achieve a dry film thickness of at least 70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should generally be used within 5 hours to maintain coating quality.
5. After using the curing agent, seal it tightly and use it promptly to prevent losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
