Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Paint Primer for Optimal Surface Preparation
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared by shot or sand blasting to the impeccable Sa2.5 level, or carefully rust-removed manually to achieve the St3 standard.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity not exceeding 85%, and wind force maintained at or below level 3. When the substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent ceases, halting construction. Outdoor work should avoid adverse conditions such as rain, fog, wind, sand, and condensation during morning and evening hours.
4.Notes:
1. Prior to application, vigorously stir component A using mechanical methods until thoroughly uniform, then blend seamlessly with component B for optimal results.
2. Consistently stir the mixture throughout the coating process to avert sedimentation, thereby maintaining the proper powder to liquid ratio and ensuring the highest quality paint film.
3. For best outcomes, the dry film thickness should be maintained at or above 70μm, completing the application in one to two coats.
4. Post-mixing, the two-component paint should ideally be utilized within 5 hours to preserve coating quality.
5. Ensure the curing agent is securely sealed and used promptly after opening to prevent losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
