FD-H001 Matt Epoxy Paint Primer for High Pressure Applications
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Prepare the steel surface by either shot blasting or sandblasting to the impeccable Sa2.5 level, or manually rust-remove to achieve the St3 level.
3.Construction conditions:
Ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity below 85%, and wind force no greater than level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent will cease to react, and construction should be halted. Avoid rainy, foggy, or windy and sandy days, as well as morning and evening condensation, for any outdoor construction projects.
4.Notes:
1. Prior to application, use mechanical stirring to thoroughly mix component A, then blend it evenly with component B.
2. Continually stir during the coating process to prevent sedimentation, ensuring the powder-to-liquid ratio remains balanced for optimum paint film quality.
3. For best results, the dry film thickness should be maintained at ≥70μm, with 1 to 2 coats being optimal.
4. Once mixed, utilize the two-component paint within 5 hours to maintain coating quality.
5. After using the curing agent, ensure it is tightly sealed and consumed promptly to prevent losses from reactions with air moisture.
Discuss this product for your project
Include your application, required quantity and destination.