Model: FD-H001

FD-H001 Matt Epoxy Paint Primer for Air Spray and Brush

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to an impeccable Sa2.5 level, or manually polished with care to reach St3 level.

3.Construction conditions:
Ensure the substrate temperature maintains a steady 3°C above the dew point, with relative humidity comfortably below 85%, and wind force not exceeding level 3. Construction should be halted when temperatures fall below 5°C, as this prevents the reaction between epoxy resin and curing agent. Steer clear of rainy, foggy, or windy conditions, as well as sandy days and morning/evening condensation, especially during outdoor applications.

4.Notes:
1. Prior to application, employ mechanical stirring to achieve an even mixture of Component A, followed by the integration of Component B, ensuring consistency throughout.
2. Maintain periodic stirring during the coating process to prevent sedimentation, which could disrupt the crucial powder-to-liquid balance, thereby affecting the quality of the resultant paint film.
3. For optimal results, it's advised to maintain a dry film thickness of at least 70μm, applying 1 to 2 coats accordingly.
4. Once mixed, the two-component paint should ideally be utilized within a 5-hour window to uphold superior coating quality.
5. After the curing agent has been expended, ensure it is securely sealed and consumed promptly to mitigate potential reactions with atmospheric water vapor that could lead to unforeseen losses.

FD-H001 Matt Epoxy Paint Primer for Air Spray and Brush
FD-H001 Matt Epoxy Paint Primer for Air Spray and Brush

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote