Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Matt Epoxy Paint Primer for All Your Projects
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring perfection.
3.Construction conditions:
The substrate temperature must surpass the dew point by 3°C, with relative humidity under 85%, and wind force no greater than level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid outdoor applications on rainy, foggy, windy, or sandy days, and during morning or evening condensation.
4.Notes:
1. Prior to use, expertly stir component A with mechanical vigor, then blend it seamlessly with component B.
2. Ensure regular stirring during the coating process to prevent sedimentation, which can disrupt the powder to liquid ratio and compromise the paint film's quality.
3. Recommended dry film thickness is ≥70μm, with 1 to 2 coats for optimal results.
4. The two-component paint should ideally be used within 5 hours post-mixing to maintain coating integrity.
5. After the curing agent is used, seal tightly and use promptly to avoid loss from reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
