Model: FD-H001

FD-H001 High-Performance Matt Epoxy Paint Primer for Applications

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to Sa2.5 level, ensuring optimal adherence, or via manual rust-removal to St3 level.

3.Construction conditions:
The substrate temperature must be meticulously maintained at least 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. Construction should cease when the substrate temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Avoid any construction during adverse weather conditions such as rain, fog, high winds, or sandstorms, and also during morning and evening times when condensation is likely.

4.Notes:
1. Prior to use, ensure thorough mechanical stirring of component A for uniformity, followed by an even mixture with component B.
2. During the coating process, regular stirring is essential to prevent sedimentation, which could disrupt the powder-to-liquid ratio and undermine the quality of the paint film.
3. It is advisable for the dry film thickness to be at least 70μm, achieved in 1 to 2 coats to ensure optimal protection.
4. After mixing, the two-component paint should ideally be utilized within 5 hours to maintain the integrity of the coating.
5. Once the curing agent is opened, it must be securely covered and utilized promptly to prevent degradation or losses due to reactions with ambient moisture.

FD-H001 High-Performance Matt Epoxy Paint Primer for Applications
FD-H001 High-Performance Matt Epoxy Paint Primer for Applications

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote