Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Dual Component Epoxy Coating - High Pressure Air Spray, Matt
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to a pristine Sa2.5 level, or through diligent manual rust removal to achieve St3 level.
3. Construction conditions:
The substrate temperature must exceed the dew point by 3°C, with relative humidity below 85%, and wind force not exceeding level 3. When the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reaction, necessitating a halt in construction activities. Avoid rainy, foggy, windy, and sandy days, as well as morning and evening condensation for outdoor projects.
4. Notes:
1. Prior to application, ensure thorough mechanical stirring of component A for uniformity, followed by even mixing with component B.
2. Maintain regular stirring during the coating process to prevent sedimentation, which can disrupt the powder-to-liquid ratio, thus impacting the quality of the paint film.
3. It is advisable for the dry film thickness to be at least 70μm, with 1 to 2 coats applied for optimal coverage.
4. Once mixed, the two-component paint should be used within a 5-hour window to maintain coating integrity.
5. After depletion of the curing agent, ensure the container is sealed tightly and used promptly to avert losses from reactions with ambient moisture.
Discuss this product for your project
Include your application, required quantity and destination.
