Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Factory Price Two-Component Epoxy Anti-Corrosive Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface should be meticulously shot or sand blasted to Sa2.5 level, or manually cleansed to St3 level for optimal results.
3. Construction Conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity maintained below 85%, and wind force kept at or below level 3. Construction should cease if the substrate temperature drops below 5°C, as the epoxy resin and curing agent will halt their reaction. Avoid rainy, foggy, windy, and sandy days, as well as condensation during morning and evening hours for outdoor applications.
4. Notes:
1. Prior to application, rigorously mix component A using mechanical stirring, ensuring it blends evenly with component B.
2. Stir regularly during the coating process to thwart sedimentation, which can disrupt the powder-to-liquid ratio and adversely impact the paint film's quality.
3. It is recommended that the dry film thickness be maintained at ≥70μm, with 1 to 2 coats applied for optimal protection.
4. Once mixed, the two-component paint should ideally be consumed within 5 hours to maintain coating efficacy, as exceeding this timeframe may compromise quality.
5. Once the curing agent is depleted, seal the container tightly and use promptly to prevent reactions with atmospheric moisture that could lead to material losses.
Discuss this product for your project
Include your application, required quantity and destination.
