Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable Two-Component Epoxy for Anti-Corrosion Protection
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is expertly prepared through shot blasting or sand blasting to Sa2.5 level, or manually rust-removed to the precise St3 level.
3. Construction conditions:
Ensure the substrate temperature is maintained at least 3°C above the dew point, with the relative humidity under 85% and wind force no greater than level 3. If the substrate temperature drops below 5°C, pause construction as the epoxy resin and curing agent cease to react. Avoid construction during inclement weather such as rain, fog, wind, and sand, as well as during morning and evening condensation for exterior projects.
4. Notes:
1. Prior to application, thoroughly blend component A with mechanical stirring for consistent mixing before combining it evenly with component B.
2. Regular stirring is essential during the coating process to prevent sedimentation, which can disrupt the powder to liquid balance and compromise paint film quality.
3. It is advisable for the dry film thickness to be ≥70μm, achieved in 1 to 2 coats for optimal results.
4. The two-component paint should ideally be utilized within 5 hours post-mixing to maintain superior coating quality.
5. Securely cover the curing agent after use to prevent reactions with ambient water vapor, ensuring it is used promptly to avoid unnecessary losses.
Discuss this product for your project
Include your application, required quantity and destination.
