Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Luster Epoxy Coating - Ideal for High Pressure Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared through shot blasting or sandblasting to Sa2.5 level or manually rust-removed to St3 level.
3. Construction conditions:
The substrate temperature must be 3°C higher than the dew point, with relative humidity under 85% and wind force not exceeding level 3. When the substrate temperature falls below 5°C, the epoxy resin and curing agent halt their reaction, necessitating a pause in construction. Outdoor application should be avoided on rainy, foggy, windy, and sandy days, as well as during early morning and evening condensation.
4. Notes:
1. Prior to use, employ mechanical stirring to thoroughly mix component A, followed by an even blend with component B.
2. Consistently stir during the coating process to avert sedimentation, which can skew the powder to liquid ratio, thus affecting the quality of the paint film.
3. It is advised that the dry film thickness reaches or exceeds 70μm, with 1 to 2 coats applied for optimal results.
4. After mixing, utilize the two-component paint within 5 hours; exceeding this time frame may compromise coating quality.
5. Once the curing agent is depleted, it must be sealed tightly and used promptly to prevent losses due to reactions with water vapor in the air.
Discuss this product for your project
Include your application, required quantity and destination.
