Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Barrel of Dual Component Epoxy Coating - Matt Finish for Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface should be prepared by shot blasting or sand blasting to achieve an Sa2.5 level, or manually rust-removed to an St3 level for optimal results.
3. Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity below 85% and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent will cease to react, and construction should be halted. Avoid undertaking work on rainy, foggy, windy, or sandy days, and during times of morning and evening condensation for outdoor projects.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then combine it evenly with component B to ensure the highest quality.
2. Regular stirring during the application process is crucial to prevent sedimentation, which can disrupt the powder-to-liquid balance and compromise the paint film quality.
3. It is advised that the dry film thickness be at least 70μm, achieved through 1 to 2 coats.
4. After mixing, the two-component paint should ideally be used within 5 hours; exceeding this timeframe may negatively impact coating quality.
5. Once the curing agent is depleted, reseal it tightly and utilize it swiftly to prevent losses from reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
