Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Dual Component Epoxy Coating - 20kg, Perfect for Brush and Roll
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be shot blasted or sandblasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with humidity below 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, reactions between the epoxy resin and curing agent cease, halting construction. Avoid construction during rainy, foggy, or windy days, and prevent condensation during morning and evening hours for outdoor applications.
4.Notes:
1. Before application, use mechanical stirring to thoroughly mix component A, then blend it evenly with component B.
2. Stir intermittently during application to prevent sedimentation, which might disrupt the powder-to-liquid balance and compromise the paint film's quality.
3. To achieve optimal results, ensure a dry film thickness of ≥70μm, completing 1 to 2 coats.
4. The mixed two-component paint should be utilized within 5 hours to preserve the coating's quality.
5. After using the curing agent, seal it immediately to prevent reactions with air moisture, which could lead to losses.
Discuss this product for your project