Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Barrel of Matt Epoxy Coating - Perfect for Brush and Roll
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
Ensure optimal performance by preparing the steel surface through shot blasting or sand blasting to Sa2.5 level, or manual rust removal to St3 level.
3. Construction Conditions:
To achieve the best application results, maintain substrate temperature at least 3°C above the dew point, with relative humidity under 85%, and wind force at a maximum of level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid outdoor application during rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring before combining evenly with component B.
2. Maintain regular stirring during application to prevent sedimentation that can disrupt the powder to liquid ratio, thus impacting the paint film quality.
3. It is advisable to apply the coating to achieve a dry film thickness of ≥70μm, completing 1 to 2 coats.
4. Once mixed, the two-component paint should be utilized within 5 hours to preserve the quality of the coating.
5. After utilizing the curing agent, ensure it is tightly sealed and used promptly to prevent adverse reactions with atmospheric water vapor, safeguarding against potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
