Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Airless Spray Epoxy Coating for Durable Finishes
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is carefully shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3. Construction conditions:
The substrate temperature must exceed the dew point by at least 3°C, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reacting, necessitating a halt in construction. Avoid rainy, foggy, windy, and sandy days, as well as condensation during morning and evening for outdoor projects.
4. Notes:
1. Prior to use, ensure thorough mechanical stirring of component A, followed by an even mix with component B.
2. Continuously stir during the coating process to avert sedimentation, which may disrupt the powder-to-liquid ratio and compromise paint film quality.
3. A dry film thickness of ≥70μm is recommended, with 1 to 2 coats completed.
4. Post-mixing, it is advisable to use up the two-component paint within 5 hours to prevent any degradation in coating quality.
5. Upon consuming the curing agent, secure it tightly and use it promptly to avert losses due to air moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
