Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Long-Lasting Steel Protection: Zinc Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface undergoes shot or sand blasting to Sa2.5 level, or manual rust removal to St3 level for optimal preparation.
3. Construction conditions:
Ensure the substrate temperature is 3°C above the dew point, with relative humidity <85%, and wind force ≤ level 3. If substrate temperature drops below 5°C, halt construction as epoxy resin and curing agent reactions cease. Avoid construction on rainy, foggy, windy, and sandy days, and be cautious of morning and evening condensation during outdoor projects.
4. Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, then blend evenly with component B for optimal results.
2. Continuously stir during the coating process to prevent sedimentation, maintaining the proper powder to liquid ratio to ensure the paint film's quality.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats as recommended.
4. Use the mixed two-component paint within 5 hours for best coating quality; exceeding this period may compromise results.
5. Once the curing agent is opened, seal tightly and use promptly to avoid losses from reactions with water vapor in the air.
Discuss this product for your project
Include your application, required quantity and destination.
