Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Rust Zinc Epoxy Primer for Steel Structures
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly shot blasted or sand blasted to an impressive Sa2.5 level, or meticulously rust-removed to a pristine St3 level.
3.Construction conditions:
Ensure the substrate temperature is always 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the essential reaction between epoxy resin and curing agent ceases, halting construction. Avoid outdoor projects in rainy, foggy, windy, or sandy conditions and during morning or evening when condensation may occur.
4.Notes:
1. Prior to application, ensure mechanical stirring to achieve an even mix of component A, which should then be thoroughly combined with component B.
2. Maintain regular stirring during the coating process to avoid sedimentation that could disrupt the powder to liquid ratio, potentially compromising the paint film quality.
3. Aim for a dry film thickness of at least 70μm, completing in 1 to 2 coats for optimal results.
4. Once mixed, utilize the two-component paint within a 5-hour window to maintain coating quality.
5. Securely seal any remaining curing agent immediately after use to prevent unwanted reactions with atmospheric water vapor, safeguarding against potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
