Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Rust Protection: Zinc Epoxy Primer for Steel Buildings
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface must be prepared through shot blasting or sand blasting to Sa2.5 level, or rust manually removed to St3 level for optimal performance.
3.Construction conditions:
The substrate temperature should exceed the dew point by at least 3°C, with relative humidity below 85%, and wind force no greater than level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent will cease to react, halting construction. Avoid outdoor work during rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation.
4.Notes:
1. Prior to application, ensure component A is mechanically stirred to achieve uniformity before combining thoroughly with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which may disrupt the powder-to-liquid ratio and compromise the quality of the paint film.
3. It is advisable for the dry film thickness to be at least 70μm, completed in 1 to 2 coats.
4. Post-mixing, the two-component paint should ideally be used within 5 hours, as exceeding this duration could impact the coating's quality.
5. Ensure the curing agent container is sealed tightly after use and consumed promptly to avert losses from reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.