Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Coverage Matt Epoxy Primer Coating - Ideal for Thick Layers
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface must be shot or sand blasted to Sa2.5 level, or manually treated to St3 level for optimal results.
3.Construction conditions:
To ensure efficacy, the substrate temperature should be at least 3°C above the dew point with relative humidity under 85%, and wind force not exceeding level 3. If substrate temperature falls below 5°C, the epoxy and curing agent cease to react, halting construction. Avoid constructing on rainy, foggy, windy, or sandy days and during morning and evening condensation for outdoor projects.
4.Notes:
1. Prior to application, ensure component A is evenly mixed through mechanical stirring, followed by a thorough mix with component B.
2. Stir regularly during application to prevent sedimentation, which can disrupt the powder-to-liquid ratio and compromise paint film quality.
3. It is advisable for the dry film thickness to be at least 70μm, achieved through 1 to 2 coats.
4. After mixing, the two-component paint should generally be used within 5 hours to maintain coating integrity.
5. Once the curing agent is opened, cover it tightly and utilize promptly to prevent loss from air moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
