Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Quick Drying Matt Epoxy Primer Coating - Perfect for Fast Projects
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to a pristine Sa2.5 level, or carefully rust-removed to the high standard St3 level.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C higher than the dew point. Maintain relative humidity below 85%, and the wind force should not exceed level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, requiring a construction halt. Avoid construction on rainy, foggy, windy, sandy days, as well as during morning and evening condensation when working outdoors.
4.Notes:
1. Prior to use, perform mechanical stirring to mix component A thoroughly, then integrate it evenly with component B for optimal results.
2. Regular stirring during the coating process is essential to avoid sedimentation, which can disrupt the powder-to-liquid ratio, potentially compromising the quality of the paint film.
3. To achieve superior coverage, it is advised to maintain a dry film thickness of ≥70μm, applying 1 to 2 coats as needed.
4. Once mixed, it is ideal to utilize the two-component paint within 5 hours; exceeding this time frame may negatively impact the coating quality.
5. After the curing agent has been used, seal it immediately and use it promptly to prevent losses due to reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
