Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Primer Coating - Ideal for Airless Spray Techniques
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface undergoes shot blasting or sand blasting to achieve Sa2.5 level perfection, or manual rust removal to attain St3 level sophistication.
3. Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity remaining under 85%, and wind force not exceeding level 3. Avoid construction when the temperature falls below 5°C, as the epoxy resin and curing agent cease reaction. Refrain from outdoor construction during rainy, foggy, windy, and sandy conditions, as well as during morning and evening condensation.
4. Notes:
1. Prior to use, employ mechanical stirring to thoroughly mix component A, and subsequently blend it uniformly with component B.
2. Maintain regular stirring during the coating process to avert sedimentation, which can disrupt the powder to liquid ratio and compromise the paint film's quality.
3. Aim for a minimum dry film thickness of ≥70μm, with the completion of 1 to 2 coats.
4. Post-mixing, utilize the two-component paint within a 5-hour window to ensure optimum coating quality.
5. After utilizing the curing agent, seal it tightly and deplete it promptly to avoid losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
