Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Heavy-Duty Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is prepared by shot blasting or sand blasting to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
Ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity below 85%, and wind force not exceeding level 3. Construction should cease when the substrate temperature falls below 5°C, as the epoxy resin and curing agent will not react. Avoid construction during rainy, foggy, windy, or sandy weather, as well as condensation in the mornings and evenings for outdoor projects.
4.Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, then blend it evenly with component B.
2. Stir regularly during the coating process to prevent sedimentation, which can disrupt the powder-to-liquid ratio and diminish the paint film quality.
3. For optimal results, ensure the dry film thickness is ≥70μm, applying 1 to 2 coats.
4. The mixed two-component paint should ideally be used within 5 hours to maintain coating quality.
5. Once the curing agent is depleted, seal it tightly and utilize it promptly to prevent loss due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
