Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Performance Matt Epoxy Primer Coating for Durable Finishes
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is expertly prepared by shot blasting or sand blasting to achieve a pristine Sa2.5 level, or manually rust-removed to the efficient St3 level.
3. Construction conditions:
For optimal application, ensure the substrate temperature exceeds the dew point by a minimum of 3°C, with relative humidity below 85% and wind force no greater than level 3. Construction should pause if the substrate temperature drops below 5°C, as the epoxy resin and curing agent will cease reacting. Steer clear of rainy, foggy, windy, or sandy conditions, and avoid morning and evening condensation during outdoor projects.
4. Notes:
1. Begin by thoroughly mixing component A using mechanical stirring, then combine it evenly with component B to ensure a homogenous blend.
2. Maintain periodic stirring throughout the coating process to prevent sedimentation, which may disrupt the powder-to-liquid ratio and compromise the quality of the paint film.
3. Aim for a dry film thickness of at least 70μm and complete 1 to 2 coats for best results.
4. Post-mixing, utilize the two-component paint within 5 hours to preserve coating integrity.
5. Once the curing agent is opened, reseal it tightly and expedite usage to avert losses from exposure to atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
