Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Quick Application Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to a pristine Sa2.5 level, or manually refined to a resilient St3 level.
3.Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point with a relative humidity below 85% and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease to react, halting construction. Exercise caution on rainy, foggy, windy, or sandy days, and avoid morning and evening condensation during outdoor projects.
4.Notes:
1. Prior to application, thoroughly engage in mechanical stirring to achieve an even mix of component A, then harmoniously combine it with component B.
2. During the coating process, routinely stir to prevent sedimentation that can disrupt the powder-to-liquid balance, potentially compromising the paint film's quality.
3. For optimal results, the dry film thickness should be maintained at ≥70μm, completing 1 to 2 coats.
4. Once mixed, the two-component paint should ideally be utilized within a 5-hour window to preserve the coating's integrity.
5. Following the use of the curing agent, ensure the container is sealed tightly and used promptly to avoid undesired reactions with airborne moisture.
Discuss this product for your project
Include your application, required quantity and destination.
