Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Multi-Purpose Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
3. Construction conditions:
The substrate temperature must exceed the dew point by 3°C, with relative humidity maintained below 85%, and wind force must not exceed level 3. If the substrate temperature falls below 5°C, the reaction between epoxy resin and curing agent ceases, necessitating a halt in construction activities. Additionally, avoid outdoor construction during rainy, foggy, windy, sandy conditions, and times of morning and evening condensation.
4. Notes:
1. Prior to use, employ mechanical stirring to thoroughly mix component A, ensuring it is consistently blended with component B.
2. Regular stirring during the coating process is crucial to prevent sedimentation, which may disrupt the balance of powder to liquid ratio and compromise the quality of the paint film.
3. It is advised that the dry film thickness should be maintained at or above 70μm, with 1 to 2 coats being applied for optimal results.
4. Once mixed, the two-component paint should generally be consumed within 5 hours to maintain the best coating quality.
5. After using the curing agent, ensure the container is tightly covered and the contents used as swiftly as possible to avoid adverse reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
