Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Primer Coating - Ideal for Multiple Surfaces
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface must be treated meticulously, either by shot blasting or sand blasting to Sa2.5 level, or manual rust-removal to St3 level to ensure optimal adhesion.
3. Construction conditions:
Ensure the substrate temperature exceeds the dew point by at least 3°C with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature is below 5°C, epoxy resin and curing agents stop reacting, halting construction. Avoid construction on rainy, foggy, windy, or sandy days, and during early morning or evening condensation.
4. Notes:
1. Prior to application, blend component A uniformly using a mechanical stirrer, then integrate with component B thoroughly.
2. Stir regularly throughout the coating process to prevent sedimentation, which compromises the powder to liquid ratio and ultimately the quality of the paint film.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal protection.
4. Use the two-component paint within 5 hours post-mixing to preserve the integrity of the coating.
5. Once the curing agent is depleted, ensure the container is sealed tightly and utilize promptly to avoid degradation from moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
