Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint for All Construction Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is skillfully shot blasted or meticulously sand blasted to meet the demanding Sa2.5 level, or meticulously rust-removed to achieve St3 level.
3.Construction conditions:
The substrate temperature must always be maintained at 3°C higher than the dew point, with relative humidity kept below 85% and wind force contained at or below level 3. For optimal results, cease construction when the substrate temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Avoid construction during inclement weather such as rain, fog, or high winds, and during periods of condensation in the early morning and evening for outdoor applications.
4.Notes:
1. Prior to application, mechanically stir component A to a uniform consistency before seamlessly blending it with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which could disrupt the powder-to-liquid balance and compromise the paint film quality.
3. For optimal protection, ensure the dry film thickness is at least 70μm, recommending 1 to 2 coats for ultimate coverage.
4. Utilize the mixed two-component paint within a 5-hour window to maintain top-notch coating quality.
5. After using the curing agent, seal it tightly and use it promptly to avert losses from reactions with airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
