Model: FD-H001

FD-H001 Epoxy Zinc Rich Primer Paint for Professional-Grade Surface Protection

FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Color
Grey
Appearance
Liquid
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Trademark
signal
Transport Package
Barrel Package in Pallet
Specification
35*30
Origin
Dongying China
HS Code
3208100000
Customization
Available
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface Treatment:

3. Construction Conditions:
Ensure the substrate temperature is consistently 3°C above the dew point, with relative humidity maintained below 85%, and wind conditions kept at or below level 3. If the substrate temperature falls below 5°C, the reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction. Avoid proceeding during inclement weather such as rain, fog, strong winds, or during times of condensation, particularly in the morning and evening when working outdoors.

4. Notes:
1. Utilize mechanical stirring to thoroughly mix component A before combining it evenly with component B for optimal results.
2. Continuous stirring during application is crucial to prevent sedimentation, which can disrupt the powder-to-liquid balance, thereby compromising the paint film's integrity.
3. Aim for a dry film thickness of no less than 70μm, completing 1 to 2 coats to ensure robust coverage.
4. The two-component mixture should be used within a 5-hour window post-mixing to maintain coating quality.
5. To prevent degradation and loss, tightly cover the curing agent once opened and use it promptly, as exposure to moisture in the air can initiate unwanted reactions.

FD-H001 Epoxy Zinc Rich Primer Paint for Professional-Grade Surface Protection
FD-H001 Epoxy Zinc Rich Primer Paint for Professional-Grade Surface Protection

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote