Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable Epoxy Zinc Rich Primer Paint for Brush and Roller Applications
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to Sa2.5 level, or manually treated for rust removal to St3 level.
3. Construction Conditions:
For optimal performance, ensure the substrate temperature exceeds the dew point by at least 3°C, with a relative humidity below 85%. Wind force should not exceed level 3. Construction should halt when the temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Avoid construction during inclement weather conditions such as rain, fog, or strong winds, and be cautious of early morning and evening condensation during outdoor applications.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, and then blend it uniformly with component B.
2. Consistent stirring during application is crucial to prevent sedimentation, which can disrupt the balance of powder to liquid ratio, potentially compromising the integrity of the paint film.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal coverage.
4. After mixing, utilize the two-component paint within 5 hours to maintain the quality of the coating, as extended time may degrade performance.
5. Once the curing agent is depleted, ensure it is sealed tightly and used promptly to avert losses from reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
