Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc-Rich Epoxy Primer Coating System for Steel Corrosion Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature must be 3°C higher than the dew point, with relative humidity under 85% and wind force not exceeding level 3. When the substrate temperature dips below 5°C, the epoxy resin and curing agent stop reacting, halting construction. Avoid commencing work on rainy, foggy, windy, or sandy days, and steer clear of condensation during morning and evening for outdoor construction.
4.Notes:
1. Prior to use, ensure component A is thoroughly mixed using mechanical stirring, then integrate evenly with component B.
2. Maintain regular stirring during the coating process to prevent sedimentation, which could unbalance the powder-to-liquid ratio and impact the paint film's quality.
3. A dry film thickness of ≥70μm is recommended, with completion of 1 to 2 coats.
4. Use the mixed two-component paint within 5 hours to ensure quality; exceeding this timeframe may deteriorate coating performance.
5. Once the curing agent is depleted, seal tightly and utilize promptly to avoid losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
