Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Protection: Zinc-Rich Epoxy Primer for Steel
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point. Maintain relative humidity below 85% and wind force at level 3 or less. When the temperature is under 5°C, the reaction between epoxy resin and curing agent halts, requiring construction activities to pause. Avoid inclement weather such as rain, fog, and strong winds, as well as morning and evening condensation for outdoor applications.
4.Notes:
1. Prior to application, vigorously stir component A using mechanical equipment, then blend thoroughly with component B to ensure uniform consistency.
2. During the coating process, regularly agitate the mixture to avert sedimentation, which could disrupt the balance of powder to liquid ratio, ultimately compromising the paint film's quality.
3. For optimal results, the recommended dry film thickness is 70μm or greater, with 1 to 2 coats being ideal.
4. It's advisable to utilize the mixed two-component paint within a 5-hour window to preserve the superior quality of the coating.
5. After consuming the curing agent, seal it tightly to swiftly utilize and prevent unwanted reactions with atmospheric moisture that could lead to product degradation.
Discuss this product for your project
Include your application, required quantity and destination.
