Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint: Ideal for High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly prepared through shot blasting or sand blasting to an immaculate Sa2.5 level, or meticulously de-rusted manually to achieve St3 level.
3.Construction conditions:
For optimal application, ensure the substrate temperature is at least 3°C above the dew point. Maintain relative humidity below 85% and wind force at or below level 3. If the substrate temperature falls below 5°C, the reaction between epoxy resin and curing agent ceases; thus, halt construction. Avoid adverse weather conditions such as rain, fog, high winds, and consider the risk of condensation during the early and late hours for outdoor applications.
4.Notes:
1. Prior to use, thoroughly stir component A using mechanical methods to achieve a uniform mixture before blending with component B.
2. Consistently stir during application to avert sedimentation, which can disrupt the powder-liquid balance and compromise the integrity of the paint film.
3. It is advisable to aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for best results.
4. Post-mixing, the two-component paint should ideally be utilized within a 5-hour window. Exceeding this time frame may adversely affect the coating quality.
5. Once the curing agent is depleted, ensure it is sealed promptly and consumed quickly to prevent degradation from atmospheric moisture interactions.
Discuss this product for your project
Include your application, required quantity and destination.
