Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint: Ideal for All Construction Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
To ensure peak performance, the steel surface should be meticulously prepared, either by shot blasting or sand blasting to Sa2.5 level, or by manual rust-removal to St3 level.
3.Construction conditions:
Construction is optimal when the substrate temperature exceeds the dew point by at least 3°C, with relative humidity maintained below 85%, and wind force at or below level 3. If the substrate temperature drops below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a suspension of construction. Avoid outdoor application in adverse weather conditions such as rain, fog, high winds, or sandstorms, as well as during condensation-prone morning and evening hours.
4.Notes:
1. Ensure thorough mixing of component A with mechanical stirring before blending evenly with component B to achieve optimal coating performance.
2. Maintain consistent stirring throughout the application to prevent sedimentation, which could disrupt the powder-to-liquid balance and compromise the coating quality.
3. For best results, aim for a dry film thickness of ≥70μm, applying 1 to 2 coats as needed.
4. The mixed two-component paint should be utilized within 5 hours to prevent degradation of the coating quality.
5. Once the curing agent is opened, secure it tightly and use promptly to prevent degradation from moisture exposure.
Discuss this product for your project
Include your application, required quantity and destination.
