Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Airless Spray Epoxy Zinc Rich Primer Paint 20kg
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared by either shot blasting or sand blasting to achieve a Sa2.5 level of cleanliness, or by manual rust-removal to the St3 standard.
3.Construction conditions:
To ensure optimal results, maintain the substrate temperature at least 3°C above the dew point, with a relative humidity of less than 85% and wind force no greater than level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, necessitating a pause in construction. Be sure to avoid construction under rainy, foggy, or excessively windy and sandy conditions, as well as during times of morning and evening condensation, especially for outdoor projects.
4.Notes:
1. Prior to application, employ mechanical stirring to thoroughly mix component A, then blend it evenly with component B to ensure consistency.
2. Regular stirring throughout the coating process is essential to prevent sedimentation, which can disrupt the powder to liquid balance and compromise the quality of the paint film.
3. To achieve the best protective layer, it is recommended that the dry film thickness be maintained at 70μm or greater, with 1 to 2 coats applied as necessary.
4. After mixing, the two-component paint should ideally be utilized within 5 hours to preserve coating quality. Exceeding this timeframe may lead to diminished quality.
5. Ensure the curing agent is sealed tightly after use and consumed quickly to prevent reaction with moisture in the air, which could cause unwanted losses.
Discuss this product for your project
Include your application, required quantity and destination.
