Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint: Perfect for High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is prepared to perfection, either by shot blasting or sand blasting to achieve an immaculate Sa2.5 level, or through meticulous manual rust-removal reaching St3 level.
3.Construction conditions:
Ensure optimal environmental conditions: the substrate temperature needs to be at least 3°C above the dew point with a relative humidity below 85% and wind force not exceeding level 3. Construction should be paused if substrate temperature falls below 5°C as the epoxy resin and curing agent will cease to react. Avoid unfavorable weather such as rain, fog, wind, sand, or condensation during mornings and evenings for outdoor projects.
4.Notes:
1. Begin by thoroughly stirring component A mechanically until uniform, then proceed to evenly blend with component B.
2. Continuously stir during the coating procedure to prevent sedimentation, as this can disrupt the balance between powder and liquid, potentially compromising the quality of the resulting paint film.
3. It is essential to achieve a dry film thickness of at least 70μm, with the application of 1 to 2 coats for optimal protection.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain coating integrity. Prolonged use beyond this time frame may deteriorate the quality of the coating.
5. After usage, the curing agent must be securely sealed and utilized promptly to avert any degradation caused by reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
