Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable 20kg Epoxy Zinc Rich Primer Paint with Matt Luster Finish
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared by either shot blasting or sand blasting to achieve a pristine Sa2.5 level, or rust is carefully removed manually to reach an St3 level, ensuring optimal paint adhesion.
3.Construction conditions:
Ensure the substrate temperature maintains a minimum of 3°C above the dew point with relative humidity kept below 85%, and wind speeds not exceeding level 3. If the substrate temperature falls below 5°C, the chemical reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction. Avoid construction during adverse weather conditions such as rain, fog, wind, or sand, as well as during morning and evening condensations for exterior projects.
4.Notes:
1. Prior to use, it is essential to employ mechanical stirring to thoroughly mix component A, ensuring a consistent blend before integrating with component B.
2. Maintain regular stirring throughout the coating process to avert sedimentation, which could disrupt the powder to liquid ratio and compromise the integrity of the paint film.
3. Aim for a dry film thickness of at least 70μm, ideally achieved through 1 to 2 coats.
4. Once mixed, the combined two-component paint should ideally be utilized within 5 hours to preserve coating quality.
5. After expending the curing agent, it is paramount to seal it tightly and utilize it promptly to safeguard against losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
