Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint for Durable Surface Protection 20kg
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly prepared through shot blasting or sand blasting to achieve a stringent Sa2.5 level of cleanliness, or meticulously rust-removed to meet the St3 level by manual methods, ensuring optimal adhesion and performance.
3.Construction conditions:
For optimum results, ensure the substrate temperature is at least 3°C above the dew point, while maintaining a relative humidity below 85% and a wind force of no more than level 3. If the substrate temperature falls below 5°C, the curing reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. Outdoor applications should be avoided during adverse weather conditions such as rain, fog, wind, and sand, as well as during times of condensation in the morning and evening.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring to ensure uniformity, then blend it with component B until a consistent mixture is achieved.
2. During the coating process, it is crucial to stir regularly to prevent sedimentation, which can disrupt the powder-to-liquid balance, potentially compromising the integrity of the paint film.
3. For best results, aim for a dry film thickness of ≥70μm, accomplished through 1 to 2 coats.
4. Once mixed, the two-component paint should ideally be used within 5 hours to ensure quality. Prolonged exposure beyond this time frame may degrade coating effectiveness.
5. After the curing agent is utilized, promptly cover and consume it to avoid losses from reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
