Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Zinc Rich Primer Paint for Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to a pristine Sa2.5 level, or manually rust-removed to an impeccable St3 level.
3.Construction conditions:
Ensure that the substrate temperature is at least 3°C higher than the dew point. Maintain relative humidity below 85% with wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease reaction, necessitating a halt in construction. Steer clear of rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation during outdoor applications.
4.Notes:
1. Prior to application, employ mechanical stirring to thoroughly blend component A before mixing it uniformly with component B.
2. Consistently stir during the coating process to avert sedimentation, which could disrupt the powder to liquid ratio and compromise the pristine quality of the paint film.
3. It is advisable to achieve a dry film thickness of at least 70μm, with 1 to 2 coats being applied for optimal coverage.
4. After mixing, the two-component paint should ideally be consumed within a 5-hour window to maintain optimal coating quality.
5. Once the curing agent is depleted, ensure it is promptly covered and utilized swiftly to avert losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
