Enlarge image
Image 1 of 6
Model: NB-1
NB-1 Indoor Water-Based Ultra-Thin Intumescent Fire-Resistive Fireproof Coating for Steel Structures
NB-1 water-based intumescent fireproof coating. Intended for indoor use.
Reference price (FOB)
US $3-3.5 / kg
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- NB-1
- Fire Prevention Mechanism
- Expansion Steel Structure
- Thickness
- Ultrathin
- Use
- Fireproof Coatings For Steel Structures
- Shelf Life
- 12 Months
- Construction Temperature
- 5℃-38℃
- Type
- Fireproof Coating
- Model
- Nb-1
- Transport Package
- 35*30
- Specification
- 20kg/Barrel
- Trademark
- Singal
- Origin
- China, Shandong
- HS Code
- 3208909090
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Packaging & shipping
- Transport Package
- 35*30
- Specification
- 20kg/Barrel
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Eco-friendly Indoor Water-based Ultra-thin Intumescent Fire-resistive Fireproof Coating for Steel Structures
This product is a water-based fire-resistant coating formulated with waterborne acrylic resin as the base material and featuring an N-P intumescent flame-retardant system as its primary ingredient. Manufactured using American technology through a fully enclosed and automated production process, it boasts exceptional properties such as a prolonged fire resistance duration, high bonding strength, excellent decorative effects, and ease of application.
Product Features

Application Area
Featured projects



Construction Technology
1. The steel structure substrate must be decontaminated and rust - proofed, and generally at least two coats of high - quality anti - rust primer should be applied.
2. After the primer is completely dry, the dust and dirt on the surface of the anti - rust paint must be removed before applying the steel structure fire - retardant coating.
3. The product should be fully stirred evenly before use. The construction is generally done by brushing, rolling or spraying. If the viscosity is too high, a diluent can be used for dilution, and the amount should be controlled within 10% of the coating amount.
4. The construction should be carried out in accordance with the principles of top - to - bottom, left - to - right, inside - first - then - outside, difficult - first - then - easy, and criss - crossing.
5. Determine the coating thickness and the number of coating layers according to the fire protection grade standards proposed by the design and fire department.
6. To ensure adhesion, the thickness of the first coating during construction must be ≤ 0.4mm.
7. The construction temperature of this product should be controlled between 5ºC and 38ºC, and the humidity should not exceed 85%. Construction is not suitable in case of rain, snow, fog, strong wind or condensation on the steel surface.
8. It is not recommended to color the fire - retardant coating.
9. The interval between the previous and next coating should be more than 24 hours.
10. The specific construction dosage and coating thickness at each stage should refer to the latest test report of the product.
Notes
1. If airless spraying is adopted, a special sprayer must be used. Avoid excessive dilution of the coating, as this will affect the adhesion of the product. Construction is not suitable when the wind force exceeds level 5.
2.
3. Store in an environment of 0-38ºC, keep away from fire sources and heat sources, and prevent exposure to sunlight.
4. The storage period is 12 months.
Comapany
Discuss this product for your project
Include your application, required quantity and destination.
